ADVANCED-LEVEL PRIMAVERA P6 TRAINING IN PAKISTAN

Primavera P6 Trainer

  • Oracle Primavera P6 specialist, PMI-SP, PMI-PMP, ITIL certified, BEng [Hons] (UK)
  • Conducted 200+ Oracle Primavera P6 training in Pakistan, abroad & online combined, since year 2010. 
  • 15 years of Project Management, IT and Engineering experience from UK, Qatar and Pakistan. 
  • Specialist in creating optimized, large schedule, in-depth project analysis and reporting using Primavera P6. 
  • Primavera consultancy provided for multi-billion$ worth of projects.

Schedule Primavera P6 Training in Pakistan 

ISLAMABAD

  • Sep 23,24,30, Oct 1
  • Oct 14,15, 21, 22
  • Nov 11, 12, 18, 19

LAHORE

  • Aug 14 - 16, 2023

KARACHI

  • May 10 - 13, 2023

Note:

  • Exclusive one-to-one Primavera P6 training in Islamabad/Rawalpindi on customized schedule is available, on request. 
  • Primavera P6 training in Pakistan's major cities on customized schedule is available.
  • Online Primavera training is available on request.

Primavera P6 Training in Pakistan & Qatar Fee

Islamabad/Rawalpindi: 
Rs 30,000
Lahore/Peshawar:
Rs 35,000

Karachi:
Rs 37,000
Qatar:
QAR 1,900
Note: Payment in installment (For Alfalah Credit card holders) is available. Full payment with any other bank's credit card is also available.

Offers: 
1. Pay for MS Project and Primavera P6 training and avail 10% discount.
2. Pay for PMI-SP and Primavera 6 training and avail 10% discount.
Companies may contact us for customized quote/schedule for their Primavera P6 training needs.

Our Clients

Our Primavera software training in Pakistan, Qatar and online was attended by participants from national and international organizations. In addition to the clients mentioned below, our training was attended by individuals from IT, construction, mechanical, chemical, telecom and other industries.

Primavera P6 Training in Pakistan

United Nations  Agha Khan Foundation Pak Army Hub Power Sachal Group Laraib Group NADRA
Engro Powergen Renewable Resources DTCE NTDC Pak Arab Engineering NHA PAEC
Descon LDA SNGPL KSB Pumps General Electric (GE) Fatima Group  HBL
Salik Foundation Top City Engro Polymer Habib Rafiq NUST Pakistan Atomic Energy  

Primavera P6 Training in Qatar

Qatar Gas Total Petroleum QDVC Al Jazeera TV Qatar Petroleum Atlantic Contracting Milaha
Descon Boston Construction AMBB Itemad Louis Berger DCB Shell

                       Register for Primavera P6 Training

##formID1c66a4d871527cd33cb04b5e4d63323fend##





 

Primavera P6 Training Fee Payment

Bank Transfer Account Name: Col (Retd) Javed Iqbal
Account No: 0030-0100005649
IBAN: PK45ASCM0000300100005649
Swift Code: ASCMPKKA
Bank: Askari Bank
Payment in office 30, Askari-7, Adyala Road, Rwp
EasyPaisa / Jazzcash 0321-555-7337

Installment 0% markup (Alfalah Credit Card holders)

Credit Card

Online card payment and card swipe option available. Contact us for procedure

Primavera P6 Training Content

1. Project Management Life Cycle

Review the relationship between Primavera and Project Management Life Cycle

Understand the five process groups in the Project Management Life Cycle

2. Data, Navigating, and Layouts

Understand project-specific and enterprise-specific data

Navigate into different windows and understand software layout

Customize a layout, open and save existing layout

3. Enterprise Project Structure (EPS)

Describe the components that comprise EPS

Create EPS

View EPS

4. Creating a Project

Create a project

Navigate in the Projects window

View and modify information in Project Details

5. Creating a Work Breakdown Structure (WBS)

Define a Work Breakdown Structure and its different uses

Create multiple levels of a WBS

6. Adding Activities

Add an activity

Describe different Activity Types

Describe different Activity Duration Types and their usage

Add Steps and Step Template to an activity

Link Steps progress to Activities

View and modify information in Activity Details

7. Creating Relationships

Differentiate between the four activity relationship types.

Define effects of creating relationships on the activities.

Define different ways of creating relationships.

View the network logic diagram.

8. Scheduling

Describe types of Critical Paths and Floats, and their impacts on

schedule

Identify loops and open ends

Calculate a schedule

Analyze the scheduling log report

9. Assigning Constraints

Apply a deadline to a project

Apply a constraint to an individual activity

Describe the available constraint types

10. Formatting Schedule Data

Group activities according to a specific criteria

Sort activities

Create and apply a filter.

Understand look-ahead filter

11. Resources

Describe roles

View the roles dictionary

Describe labor, non-labor and material resources.

View the resource dictionary and understand resource properties.

12. Roles

Create Roles

Assign roles to an activity

Assign rates on roles

13. Assigning Resources and Costs

Assign labor, non-labor, and material resources to activities

Different methods to adjust Budgeted Units/Time of a resource

Assign expenses to activities

14. Analyzing Resources

Display the Resource Usage Profile and Spreadsheet

Customize the Profile and Spreadsheet

Analyze resource utilization and over-allocation.

15. Optimizing the Project Plan

Analyze schedule dates

Learn techniques to shorten a project schedule

Analyze resource utilization.

Define and perform resource leveling and resource smoothing

Analyze project costs, reduce project costs

16. Baselining the Project Plan

Create a project baseline

Display baseline bars on the Gantt Chart

Modify the bars on the Gantt Chart

17. Project Execution and Control

Understand different methods of updating project schedule

Status activities

Suspend and resume activity

Reschedule the project and determine variances in costs, units and schedule

18. Reporting Performance

Describe reporting methods

Create a report category

Create a report with the Report wizard

Modify report's layout.

Create a report using the current layout

Print Profile, Spreadsheet, Gantt Chart, Network Diagram, WBS,

Project, Tracking and Activity Table

19. Using Codes 

Understand Codes 

Create a Project, Activity and Resource Code

Assign a Code to a Project, Activity or Resource

Use a Code in a Filter or Group

20. Maintaining the Project Documents Library

Describe the difference between a reference document and work product

Create a Document Record

Link the document record to a document file

Assign the project document to an activity or WBS

21. Importing and Exporting Data

Importing and Exporting Project Data

Using the Import and Export Wizard

22. Formatting and Printing

Formatting Gantt Chart, Project, WBS, Tracking and Activity Layout

Printing Profiles, Spreadsheets, Network Diagram, Tables and Gantt Charts

Configuring Optimal printing settings

23. Creating Calendars

Understand Calendars

Creating and modifying a Calendar

Assigning a Calendar to Projects, Resources and Activities

Analyzing effect of assigning a Calendar

24. Advanced Scheduling

Understand Critical, Near-Critical and Critical Chain Activities

Calculate Multiple Float Paths

Total Float Calculation Methods

25. Using Earned Value Analysis

Understand important Earned Value Management (EVM) formulas

Display Earned Value information and graphs

26. Project Website

Create, customize and launch a Project Website

Publish Project layouts as HTML pages

27. Tracking Layout

Understand the Tracking Layout

Customize the Tracking Layout

Compare WBSs or Projects

Analyze Projects Cost or Resources Units

Forecast Schedule

28. Risk, Issues & Thresholds

Add Risk to a Project

Analyze the probability and impact of a risk

Create an Issue

Define Threshold values

Monitor Threshold and Issues

29. Claim Digger (Schedule Comparison)

Configure Claim Digger Options

Compare projects with Claim Digger

30. User Access

Create a New Primavera User

Define User Security Profiles

Apply a Security Profile to a user

31. Global Changes

Define Global Change Parameters

Apply a Global Change to a Project

32. Portfolios

Create a Project portfolio

View and open a project from a project portfolio

33. Admin Preferences, Categories

Understand, Configure Admin Preferences

Modify or Create New Admin Categories

34. Top-Down Estimation

Estimate WBS or Resource Activity

Use Estimation Method

View, Apply Estimation History

35. Storing Period Performance

Store Past Project Period Performance

View Past Project Period Performance

36. Activity/Resource Usage Profile and Spreadsheet

Display S-Curves, Histogram in Profile

Display Activity, Cost and Unit Period Data in Spreadsheet

37. Tips and tricks for creating, modifying, analyzing, updating and reporting on projects.

38. Question & Answer Session / Case Studies. Students are welcome to bring in their scheduling requirements to get instructor's feedback. 
Obtain premium, advanced level Primavera P6 training in Pakistan or online from us and become an expert project planner.